HIGHTOP

 
Infrastructure

Project Details

Located in San Antonio, just minutes from Randolph AFB, Cast was selected to complete the earthwork, wet utilities, and road construction. This project included the excavation of a deep drainage channel, construction of several retaining walls, and a uniquely engineered road structure.

PROJECT HIGHLIGHTS:

  • 241 Single Family Lots

  • 15,715 LF Wet Utilities

  • 34,260 SY Streets (Subgrade, Base, Paving, and Curb)

  • 215,000 CY of Earthwork