Located in San Antonio, just minutes from Randolph AFB, Cast was selected to complete the earthwork, wet utilities, and road construction. This project included the excavation of a deep drainage channel, construction of several retaining walls, and a uniquely engineered road structure.
PROJECT HIGHLIGHTS:
-
241 Single Family Lots
-
15,715 LF Wet Utilities
-
34,260 SY Streets (Subgrade, Base, Paving, and Curb)
-
215,000 CY of Earthwork